The Updated DEC Methodology Explained

On 11 November 2026 the Ministry of Housing, Communities and Local Government updated its methodology for operational ratings, Display Energy Certificates (DECs) and recommendation reports. If you occupy a public building, or manage one for a public authority, this is the document that sets out exactly how your DEC is calculated and what your assessor must do. Here are the points that matter most.

Does your building need a DEC?

A DEC and a recommendation report are required for buildings with a total useful floor area over 250m² that are occupied in whole or part by public authorities and frequently visited by the public. The building must have a roof and walls and use energy to condition the indoor climate, which means it has fixed heating, mechanical ventilation or air conditioning.

Validity depends on size. For buildings over 1,000m², the DEC lasts 12 months and the recommendation report seven years. For smaller buildings, both last 10 years.

Note the terminology too. What used to be called the advisory report is now consistently called the recommendation report.

How the operational rating works

The operational rating compares your building's annual CO2 emissions per square metre against what is typical for that type of building. A typical building scores 100, a zero carbon building scores zero, and a building producing twice the typical emissions scores 200. The result is shown on the familiar A to G scale: A is 0 to 25, B is 26 to 50, C is 51 to 75, D is 76 to 100, E is 101 to 125, F is 126 to 150 and G is anything above 150.

Buildings are placed in one of 29 CIBSE benchmark categories, and the benchmark is adjusted for local weather using 2021 standard degree days. Where there is robust evidence such as attendance records or published opening hours, signed off by the occupier, the benchmark can also be adjusted for longer occupancy hours. Mixed use buildings can use a composite benchmark weighted by floor area.

Data quality is front and centre

The methodology is clear that at least 95% of a building's energy must be metered or estimated within acceptable limits. Key rules for occupiers and assessors:

  • Energy data should cover 365 days, with a tolerance of 31 days either side. Outside that, supplier estimates are needed.

  • Only estimates from utility suppliers are allowed. Estimates made by the assessor or anyone else are not.

  • Metered exports of electricity are netted off imports, but unmetered exports cannot be counted.

  • A new occupier does not need a DEC until they have been in the building for 15 months, but should keep energy records from day one.

  • Assessors use the building's UPRN and previous report reference numbers to pull through earlier ratings and recommendation reports.

Separable energy uses and renewables

Some energy uses can be removed from the rating, but only from a short approved list: regional server rooms, trading floors, bakery ovens, sports floodlighting, furnace and heat treatment processes, and blast chilling or freezing. They must be permanently sub metered, have a documented efficiency review within the last two years, and be signed off by the occupier's premises manager. If you have one of these loads, sub metering is the route to a fairer rating.

On site renewables and low carbon technologies are acknowledged on the DEC where their output is metered. The methodology also notes that the 0.80 boiler efficiency and 2.25 chiller efficiency used to calculate the renewable CO2 contribution come from a superseded 2006 guide and should be treated as historical reference points rather than current minimum standards.

Recommendation reports: more structure, always a site visit

An energy walk around survey is always required to produce a recommendation report. The report can contain up to 30 recommendations, split into 15 short term (payback up to 3 years), 10 medium term (3 to 7 years) and 5 long term (over 7 years) measures. Each one is given a high, medium or low carbon impact. Assessors can add bespoke recommendations from valid sources such as an energy survey, air conditioning inspection or boiler inspection report, and must reference them.

On multi building sites, each qualifying building needs its own recommendation report. A single site wide report is not permitted.

Site visits and how DECs are produced

A first DEC always needs a site visit. For buildings over 1,000m², a renewal can be produced without a visit if the same assessor does it and the occupier or another suitably qualified person declares that nothing has changed. For buildings of 1,000m² or less, a visit is always required.

Assessors use government approved software and a Central Information Point file that is refreshed on the 10th of every month. Once the data file is lodged, the register generates the final DEC, which the occupier can retrieve using the report reference number or by searching the building's postcode or street name.

What to do now

  • Check when your DEC and recommendation report expire, and book your assessor early so your meter data lines up with the 365 day window.

  • Gather 12 months of meter readings, and make sure no fuel or meter is missing.

  • Keep occupancy evidence such as attendance records and opening hours, and have it signed off.

  • If you run a server room, kitchen or other process load, consider sub metering it.

  • Make sure the DEC on display is the current one.

If you would like help with a DEC, a recommendation report or an energy audit for a public building, get in touch with Douglas Energy Solutions at douglasenergysolutions.co.uk.

Douglas Energy Solutions is led by a certified ESOS Lead Assessor and approved Elmhurst. Energy Surveyors. We work with UK businesses on fixed fee energy audits, ESOS, EPCs, SECR and energy monitoring. To talk about your building, call 07787 417 393, email info@douglasenergysolutions.co.uk or book a call.

Source: MHCLG, The government methodology for operational ratings, display energy certificates and recommendation reports (updated 11 November 2026), gov.uk.